Placing on the market vs making available: the definitions that decide your obligations

Placing on the market is the first supply of a product unit in the EU. See how it differs from making available and which of your actions trigger duties.
A timeline card on blue gradient columns tracing a drill press batch from customs release past the 20 January 2027 Machinery Regulation cutover to first use in a workshop.
November 10, 2026

Marc HaddadMarc HaddadForward Deployed Regulatory Engineer

 

Placing on the market is the first time an individual product unit is supplied for distribution, consumption or use on the European Union (EU) market. Every later supply of that unit is making available on the market. Placing happens once per unit, not once per model, and its date decides which version of EU rules the unit must meet.

 

Key points

 

  • Placing on the market: the first supply of an individual unit in the EU, which happens once per unit, not once per model.
  • Making available: every later handover (importer to distributor, distributor to retailer, retailer to customer), which carries its own duties but does not reset the date.
  • Putting into service: first use by the end user, which matters only under the acts that use it, such as those on lifts, machinery and radio equipment.
  • The placing date: decides which version of a rule applies to that unit, so track it by serial number or batch, especially when a rule is about to change.

What does placing on the market mean?

 

Under Regulation (EU) 2019/1020, placing on the market is “the first making available of a product on the Union market”.[1] It is a one-off event for each unit, and it is the moment the law uses to judge whether that unit complies.

 

The term is built on a wider one, making available on the market, which means “any supply of a product for distribution, consumption or use on the Union market in the course of a commercial activity, whether in return for payment or free of charge”.[1]

 

The General Product Safety Regulation (EU) 2023/988 (GPSR) uses the same wording,[2] and the sector acts repeat it with their own product noun. The Low Voltage Directive 2014/35/EU, for example, says “electrical equipment”,[3] and the Machinery Regulation (EU) 2023/1230 has its own versions.[4] Always read the definition in the act you are applying.

 

A supply is a transfer of ownership, possession or any other property right in the product, and the goods do not have to move physically.[5] Free samples supplied in the course of business count.

 

The Blue Guide (Commission Notice 2022/C 247/01) is the European Commission’s guidance on these concepts, and while it is not law, it is where the Commission works them out in detail. Most of the section references in the notes point to it.

What is the difference between placing on the market and making available?

 

Placing on the market happens once, at the first supply of a unit in the EU. Making available covers that first supply and every one after it, by every business in the chain, and the unit must comply each time.

 

The placing is therefore done by whoever supplies the unit first in the EU: the manufacturer, or the importer for goods made outside the EU. When your distributor later sells the unit, that is making available, not placing. Our guide to economic operators covers which businesses in the supply chain (the “economic operators”) carry which duties at each step.

 

The table below shows what each of the three terms means, who does it and what it triggers.

 

Term What it means Who does it What it triggers
Making available Any supply for distribution, consumption or use in the EU, in a commercial activity, paid or free Every operator in the chain The unit must comply each time it is supplied
Placing on the market The first making available of that unit in the EU The manufacturer, or the importer for goods made outside the EU Fixes which version of the rules applies; conformity work, declaration and marking must be finished
Putting into service First use for its intended purpose in the EU The end user, or an employer supplying equipment to staff Only under acts that cover it; brings in products that were never placed on the market, such as some built for own use

What is putting into service?

 

Putting into service is the first use of a product in the EU by the end user.[5] It is a separate moment from placing, it counts only under the acts that use it, and it can come months after placing.

 

Acts that use it include those on lifts, machinery and radio equipment, and the Machinery Regulation defines it as “the first use, for its intended purpose, in the Union, of machinery or related products”.[4]

 

A unit placed before new rules apply can still be put into service after they apply, unless the new act says otherwise.[5]

Why does the placing date matter?

 

The placing date is the moment compliance is judged: products “must comply with the applicable Union harmonisation legislation at the moment of placing on the market”.[5] Union harmonisation legislation means the EU acts that set common product requirements.

 

This works unit by unit, because making available “refers to each individual product, not to a type of product”.[5] A model on sale since 2023 has units being placed today, under today’s rules, so “we placed that model in 2023” does not protect new units.

When is a product placed on the EU market?

 

A unit is placed when it is finished and supplied for the first time for distribution, consumption or use in the EU. To date a unit, run three checks:

 

  1. Is manufacturing finished? An offer or agreement made before manufacture is complete is not a placing.[5]
  2. Has a supply happened? There must be a transfer of a right for distribution, consumption or use in the EU, and a supply for export is not making available on the EU market.[5]
  3. Is it the first? “Each individual product can only be placed once on the Union market”,[5] so every supply after that is making available.

 

A unit is not placed on the market while it:

 

  • sits unsold in the manufacturer’s or importer’s stock
  • is “displayed or operated under controlled conditions” at a trade fair, exhibition or demonstration
  • is a pre-production unit supplied for testing or validation
  • was made for the maker’s own use, unless the act covers own use.[5]

 

The Machinery Regulation lets you display non-compliant machinery only with a visible sign that it does not comply and will not be made available until it does.[4]

When are products sold online placed on the EU market?

 

An online offer counts as making available if it is targeted at end users in the EU, or consumers in the GPSR’s wording.[1, 2] A website that is merely accessible from the EU is not enough.

 

The Blue Guide treats delivery to the EU, payment from EU buyers and EU languages as signs of targeting.[5] A unit shipped direct from outside the EU is placed when the end user’s order “has been placed and confirmed”. Stock sent ahead to an EU fulfilment service provider is placed when it is released for free circulation, meaning cleared by customs for sale in the EU.

Do imports, intra-group transfers and used products count as placing on the market?

 

Yes, in each case the first supply in the EU is a placing, even when it stays inside your own group.

 

Imports: placing can happen before or after customs release, and release “should not be considered to be proof of conformity”. Goods that need work to comply should be declared for free circulation only after they have been made compliant.[5]

 

Intra-group transfers: shipping to your own EU sales branch is a placing,[5] and so is supplying your own employees for use in the EU.[5]

 

Second-hand products: used products imported from outside the EU are placed when they enter the EU market for the first time,[5] while resale of a unit already in the EU is making available. The GPSR still applies to used consumer products supplied commercially, with antiques excluded.[2]

When does a modified or refurbished product count as a new placing?

 

A modified product is placed anew when the change is big enough to make it a new product, and calling it “refurbished” or “remanufactured” does not decide that.

 

Under the Blue Guide, a modified product is a new product if its “original performance, purpose or type is modified, without this being foreseen in the initial risk assessment”, the nature of the hazard has changed or the level of risk has increased, and it is then made available.[5] The person who modified it becomes its manufacturer and places it anew, and software changes are judged the same way.

 

For consumer products, the GPSR sets similar criteria and leaves out changes consumers make for their own use.[2] A repair that is not a substantial modification needs no new conformity assessment (the checks that show a product meets the act).

 

Spare parts: whether a spare part is a product in its own right depends on how the act defines its scope.[5] Where it is, each spare has its own placing date, separate from the machine it will go into.

What happens to existing stock when an EU rule changes?

 

Units placed before the cutover follow the old rules as far as the new act’s transitional article allows, while units not placed before the cutover must fully comply with the new act.[5]

 

A transitional article is the part of a new act that says how products already on the market are treated, and each one hangs on the placing date of each unit:

 

  • GPSR: products placed under Directive 2001/95/EC before December 13, 2024, may still be made available.[2]
  • Machinery Regulation: the corrected date is January 20, 2027; the original Official Journal text said January 14, 2027.[4]
  • Cyber Resilience Act (CRA), Regulation (EU) 2024/2847: products placed before December 11, 2027, come under it only if they are substantially modified from that date.[6]

 

The definitions themselves rarely move, but the act each unit is measured against does, so when a rule is revised, check its transitional article first. Cutovers like these are scattered across acts and markets, and Daptic tracks the rule changes that reach each of your products and flags their cutover dates, so the date reaches the people who decide where stock sits.

 

The Blue Guide’s 2022 edition is current. A new edition can shift how the Commission reads online sales, modifications and imports, but only the legal texts bind.

What should manufacturers record for each unit?

 

You should be able to show when, by whom and under which rules each unit was placed. Declarations of conformity and technical documentation, covered in their own guides, should reference the act in force at each unit’s placing. For each unit, keep:

 

  1. Date of first supply: the date it was first supplied in the EU, and the document that proves it (invoice, order confirmation or customs release).
  2. Completed manufacture: proof that manufacturing was complete on that date, linked by serial number or batch.
  3. Who placed it: you, your importer or a fulfilment service provider’s customer.
  4. Applicable rules: which version of each act applied on that date, and a declaration that cites it.
  5. Cutover side: for units held across a cutover, which side of the date each one fell.

Example: dating two batches of drill presses across a cutover

 

Here is how the three checks work for one product as a rule changes. Suppose a drill press maker outside the EU finishes a batch of 200 units, and nothing is placed while they sit in its warehouse. One unit goes to a German trade fair with a non-compliance sign, and it is still not placed.

 

On January 12, 2027, customs releases the batch to the EU importer that bought it. That release is the placing for all 200 units, and the importer is the one placing them.[5] The importer sells 50 to a tool distributor in February, and the distributor sells 10 to a retailer in March. Both sales are making available, and the units carry their Directive 2006/42/EC declaration throughout. When a workshop buys one and runs it in April, that is putting into service.

 

A second batch, finished in December but held at the port until January 25, was not placed before the January 20, 2027, cutover, so it needs a declaration under the Machinery Regulation before release. Thirteen days between the two customs releases decided which law each batch had to meet.

 

To apply this to your own product, take the cutover date from your act’s transitional article and run the same checks on each batch.

Frequently asked questions

What does placing on the market mean?

Placing on the market means the first making available of a product on the EU market: the first supply of an individual unit for distribution, consumption or use in the EU in the course of a commercial activity. It happens once per unit, not once per model.

What is the difference between placing on the market and making available?

Placing on the market is the first supply of a unit in the EU, done by the manufacturer or the importer. Making available is any supply, including every later one by distributors and retailers, and the unit must comply each time.

Is a product placed on the market when it is shown at a trade fair?

No. A unit displayed or operated under controlled conditions at a trade fair, exhibition or demonstration is not placed. Under the Machinery Regulation, non-compliant machinery on display needs a visible sign that it does not comply and will not be made available until it does.

When is a product sold online from outside the EU placed on the market?

A unit shipped direct from outside the EU is placed when the end user’s order has been placed and confirmed. Stock sent ahead to an EU fulfilment service provider is placed when it is released for free circulation.

Is a used product placed on the market again when it is resold?

No. Resale of a unit already in the EU is making available, while used products imported from outside the EU are placed when they enter the EU market for the first time.

Do products placed before a new rule applies have to meet the new rule?

It depends on the new act’s transitional article, which is keyed to each unit’s placing date, but units not placed before the cutover must fully comply with the new act.

Notes and sources

 

  1. Regulation (EU) 2019/1020, Article 3(1), 3(2); Article 6
  2. Regulation (EU) 2023/988 (GPSR), Articles 2, 3(6), 3(7), 4, 13(2) and (3), 51
  3. Directive 2014/35/EU, Article 2(1), 2(2)
  4. Regulation (EU) 2023/1230, Articles 3(11) to (13), 3(16), 4(2), 52(1); corrigendum, OJ L 169, July 4, 2023)
  5. Commission Notice 2022/C 247/01, Blue Guide 2022), sections 2.1 to 2.6, 2.10, 2.12
  6. Regulation (EU) 2024/2847 (Cyber Resilience Act), Articles 69(2), 71(2)

 

Additional sources:

 

  • Last reviewed November 9, 2026.

 

This article reflects Marc Haddad’s independent opinions, not necessarily those of Daptic.